At the moment,we are working in Sri Trang Group project. The scope of work is fabrication and installation of steel structures and machines for the production of medical gloves with 120 Manpower/day, 5-months and 160 Manpower/day, 8-months installation and commissioning period.

We cooperate with foreign company, “The Khamkeut Saen U-dom Gold Mine Project”. Scope of work is EPC, installation and commissioning for 10 lines of conveyor system – belt width 1200 mm., length 520 m. which have capacity 750 TPH.

Continue working in “MMRP1” - “Mae-Moh” power plant’s project.

We have opportunity working with “Mae-Moh” power plant. The scope of work is coal conveyor system relocating and installation. There are 2 lines of belt conveyor system with S4 - length approximately 1800 m. and R5- length approximately 1400 m. which have belt width 1200 mm. we have followed with great command completion.

We got a big project called “MMRP1” - “Mae-Moh” power plant’s project. We have experience to manage 450 manpower to work in belt conveyor system works (installation and commissioning)

The beginning work of company: We start working with TPI Polene Public Company Limited. The scope of work is fabrication and installation of conveyer coal line4 belt – belt width 800-1400 mm, about 2 Km length. There are 11 lines of belt conveyor system with Pulse Jet Bag Filter (Air Pollution Control Technology)